Fast door control panel installation skills

Aug 19, 2021

Leave a message

Fast door control panel installation skills

1. Encoder installation:

Insert the shaft head of the encoder into the 10mm slot reserved by the reducer, and fix the two screws on the reducer hand in hand. This requires that the screws should be locked to prevent the encoder from loosening and leading to the ultimate shedding.

2. Control panel installation:

The control panel is mounted on the side of the motor, and the distance from the ground to the port below the control panel is 1.3 m, and the distance between the control panel and the track is 100 mm. Radar lines, motor lines, optical fiber lines, encoders and other lines from wire pipes into the control panel.

3. Wiring and debugging method:

There is a control wiring diagram for the specific control panel, please ensure that the line position is correct.

4. Box installation:

At the end of commissioning, the door body box cover was fixed with self-drilling screws and the motor cover was fixed on the wall with expansion rubber plugs.

www.v-signindustrial.com


Send Inquiry