High speed door wiring debugging

Jan 10, 2022

Leave a message

High speed door wiring debugging

1. Route is join fast shutter core area of each component to run each other, in view of the connection parts refer to package insert is usually has the actual show that therefore before wiring should be carefully read the product introduction, very is terminal wiring diagram it together, to master the effect of each connection terminals and wiring regulations, facilitate accurate wiring work.

2. After connecting the line to the switching power supply, check whether the fault indicator is blinking. If the indicator is on and accompanied by an alarm sound, it indicates that the phase sequence of the switching power supply is not correct and lacks phase.

3. Manual operation inspection, press the button to raise the door page quickly to the top; Start the light lower button, the door will quickly lower to the bottom; When the door is in operation or stationary, press and hold the emergency stop switch, the door will immediately stop at the origin, no longer in operation. If running or application again, if you turn off the emergency stop switch, you can resume the application.

4. Check the security photoelectric switch. If the light source is blocked by barricades in the whole process of lowering the door page, the fast door will immediately rise and return to the opening and closing part.

www.v-signindustrial.com


Send Inquiry